Search icon

Hayes Heat Treating Corp.

Company Details

Name: Hayes Heat Treating Corp.
Jurisdiction: Rhode Island
Entity type: Domestic Profit Corporation
Status: Merged Into An Entity Of Record
Date of Organization in Rhode Island: 23 Apr 1962 (63 years ago)
Date of Dissolution: 24 Feb 1999 (26 years ago)
Date of Status Change: 24 Feb 1999 (26 years ago)
Identification Number: 000016025
ZIP code: 02910
County: Providence County
Principal Address: 800 WELLINGTON AVE, CRANSTON, RI, 02910, USA

Agent

Name Role Address
SANDRA MATRONE MACK, SEC Agent HASLAW LLC 1500 FLEET CENTER, PROVIDENCE, RI, 02903, USA

PRESIDENT

Name Role Address
CARL I HAYES JR. PRESIDENT 800 WELLINGTON AVE CRANSTON, RI 02910 USA

Events

Type Date Old Value New Value
Merged 1999-02-24 Hayes Heat Treating Corp. Wellington

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
333867224 0112300 2012-04-16 800 WELLINGTON AVE, CRANSTON, RI, 02910
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2012-06-28
Emphasis N: CHEMNEP
Case Closed 2013-01-10

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19100119 D03 I D
Issuance Date 2012-07-10
Abatement Due Date 2012-08-21
Current Penalty 1000.0
Initial Penalty 2000.0
Final Order 2012-07-20
Nr Instances 1
Nr Exposed 17
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.119(d)(3)(i)(D): Process safety information pertaining to the equipment in the process did not include the relief system design and design basis: (a) Anhydrous Ammonia storage tank: The process safety information for the anhydrous ammonia storage tank did not include any information pertaining to the relief system design and design basis for the two pressure relief valves located on top of the tank, on or about 4-16-12.
Citation ID 01002
Citaton Type Serious
Standard Cited 19100119 E01
Issuance Date 2012-07-10
Abatement Due Date 2012-08-21
Current Penalty 1000.0
Initial Penalty 2000.0
Final Order 2012-07-20
Nr Instances 1
Nr Exposed 17
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.119(e)(1): The employer did not perform an initial process hazard analysis (hazard evaluation) on processes covered by 29 CFR 1910.119: (a) Facility: The employer did not perform a process hazard analysis of the ammonia storage system, on or about 4-16-12.
Citation ID 01003
Citaton Type Other
Standard Cited 19100119 J04 I
Issuance Date 2012-07-10
Abatement Due Date 2012-08-21
Current Penalty 0.0
Initial Penalty 2000.0
Final Order 2012-07-20
Nr Instances 1
Nr Exposed 17
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.119(j)(4)(i): The employer did not perform inspection and tests on process equipment: (a) Anhydrous Ammonia System: The employer did not have a plan for the inspection and testing of the piping system, such as but not limited to recommendations contained in API 570 Piping Inspection Code, on or about 4-16-12.
Citation ID 01004
Citaton Type Other
Standard Cited 19100119 O01
Issuance Date 2012-07-10
Abatement Due Date 2012-07-24
Current Penalty 0.0
Initial Penalty 1200.0
Final Order 2012-07-20
Nr Instances 1
Nr Exposed 17
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.119(o)(1): The employer did not certify that they have evaluated compliance with the provisions of this section at least every three years: (a) Anhydrous Ammonia System: The employer did not perform a compliance audit of the Anhydrous Ammonia system at least every three years, on or about 4-16-12.
Citation ID 02001
Citaton Type Other
Standard Cited 19100119 D03 I B
Issuance Date 2012-07-10
Abatement Due Date 2012-07-24
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2012-07-20
Nr Instances 1
Nr Exposed 17
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.119(d)(3)(i)(B): Process safety information pertaining to the equipment in the process did not include piping and instrument diagrams (P&ID's): (a) Anhydrous Ammonia System: The employer's piping and instrumentation diagram was out of date, and was not accurate and did not represent equipment that was existing and was part of the process, on or about 5-24-12.
Citation ID 02002
Citaton Type Other
Standard Cited 19100119 J02
Issuance Date 2012-07-10
Abatement Due Date 2012-07-24
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2012-07-20
Nr Instances 1
Nr Exposed 17
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.119(j)(2): The employer did not establish written procedures to maintain the on-going integrity of process equipment: (a) Outside Facility: The employer did not establish a written procedure for the preparation and painting of the anhydrous ammonia tank and pressure relief valve manifold for the prevention of corrosion, on or about 4-16-12.
913574 0112300 1985-06-06 800 WILLINGTON AVE, CRANSTON, RI, 02910
Inspection Type Planned
Scope Complete
Safety/Health Health
Close Conference 1985-06-06
Case Closed 1985-07-09

Violation Items

Citation ID 01001
Citaton Type Other
Standard Cited 19100111 B10 II
Issuance Date 1985-06-25
Abatement Due Date 1985-07-09
Nr Instances 1
Nr Exposed 14

Date of last update: 06 Apr 2025

Sources: Rhode Island Department of State