Inspection Type |
Prog Related
|
Scope |
Complete
|
Safety/Health |
Safety
|
Close Conference |
2023-05-05
|
Emphasis |
N: CTARGET, N: FALL, L: FALL, P: CTARGET
|
Related Activity
Type |
Inspection |
Activity Nr |
1668194 |
Safety |
Yes |
|
Type |
Inspection |
Activity Nr |
1668205 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260102 A01 |
Issuance Date |
2023-08-02 |
Current Penalty |
2277.0 |
Initial Penalty |
2277.0 |
Final Order |
2023-09-08 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.102(a)(1): Employees did not use eye and face protection equipment when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents. a) Jobsite: On or about 5/5/2023, an employee was not wearing protective eyewear when working with power tools. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260451 G01 VII |
Issuance Date |
2023-08-02 |
Abatement Due Date |
2023-08-25 |
Current Penalty |
6250.0 |
Initial Penalty |
6250.0 |
Final Order |
2023-09-08 |
Nr Instances |
1 |
Nr Exposed |
1 |
Related Event Code (REC) |
Imminent Danger |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. a) Building Lobby: On or about 5/5/2023, the skyjack scaffold, used by an employee to install furring strips on the second floor ceiling, had no guardrail system installed at one end nor was a personal fall arrest system used, exposing an employee to an approximate two-story fall hazard. |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19261052 B03 |
Issuance Date |
2023-08-02 |
Abatement Due Date |
2023-09-18 |
Current Penalty |
5358.0 |
Initial Penalty |
5358.0 |
Final Order |
2023-09-08 |
Nr Instances |
3 |
Nr Exposed |
7 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.1052(b)(3): Treads for temporary stairway service were not installed the full width and/or depth of the stair: a) Main Stairwell, ground floor to mid-landing: On or about 5/5/2023, employees were exposed to trip and fall hazards when using stair treads in varying lumber sizes that did not cover the full depth of the stair. b) Main Stairwell, mid-landing to second floor: On or about 5/5/2023, employees were exposed to trip and fall hazards when using stair treads in varying lumber sizes that did not cover the full depth of the stair. c) Main Stairwell, second floor to mid-landing: On or about 5/5/2023, employees were exposed to trip and fall hazards when using stair treads in varying lumber sizes that did not cover the full depth of the stair. |
|
Citation ID |
02001 |
Citaton Type |
Other |
Standard Cited |
19260454 A |
Issuance Date |
2023-08-02 |
Abatement Due Date |
2023-09-18 |
Current Penalty |
501.0 |
Initial Penalty |
501.0 |
Final Order |
2023-09-08 |
Nr Instances |
1 |
Nr Exposed |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. a) Jobsite: On or about 5/5/2023, the employer allowed an employee to work on a skyjack scaffold without adequate training by a competent person to recognize hazards. |
|
Citation ID |
03001A |
Citaton Type |
Other |
Standard Cited |
19030019 C01 |
Issuance Date |
2023-11-17 |
Abatement Due Date |
2023-12-21 |
Current Penalty |
501.0 |
Initial Penalty |
501.0 |
Final Order |
2023-12-18 |
Nr Instances |
1 |
Nr Exposed |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: (a) Establishment: As of November 17, 2023, the employer had not certified to OSHA that the abatement had been completed for Citation 1, Items 2 and 3, and Citation 2, Item 1 from inspection number 1668216, issued on 8/2/2023, with a final order date of 9/8/2023. |
|
Citation ID |
03001B |
Citaton Type |
Other |
Standard Cited |
19030019 D01 |
Issuance Date |
2023-11-17 |
Abatement Due Date |
2023-12-21 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2023-12-18 |
Nr Instances |
1 |
Nr Exposed |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1903.19(d)(1):The employer did not submit to the Agency documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required. (a) Establishment: As of November 17, 2023, the employer had not provided the required abatement documentation to OSHA for Citation 1, Items 2 and 3, and Citation 2, Item 1 from inspection number 1668216, issued on 8/2/2023, with a final order date of 9/8/2023. |
|
|