Name: | PRO-FAST Construction Services Inc |
Jurisdiction: | Rhode Island |
Entity type: | Domestic Profit Corporation |
Status: | Revoked Entity |
Date of Organization in Rhode Island: | 28 Jul 2015 (10 years ago) |
Date of Dissolution: | 15 Nov 2018 (6 years ago) |
Date of Status Change: | 15 Nov 2018 (6 years ago) |
Identification Number: | 001339009 |
ZIP code: | 02919 |
County: | Providence County |
Principal Address: | 18 DERBY AVENUE, JOHNSTON, RI, 02919, USA |
Purpose: | PAINTING CONTRACTOR Title: 7-1.2-1701 |
NAICS
23 ConstructionThe Sector as a Whole Learn more at the U.S. Census Bureau
Name | Role | Address |
---|---|---|
DAVID FREZZA JR. | Agent | 18 DERBY AVENUE, JOHNSTON, RI, 02919, USA |
Name | Role | Address |
---|---|---|
DAVID FREZZA, JR. | INCORPORATOR | 18 DERBY AVENUE JOHNSTON, RI 02919 USA |
Number | Name | File Date |
---|---|---|
201881295530 | Revocation Certificate For Failure to File the Annual Report for the Year | 2018-11-15 |
201875637230 | Revocation Notice For Failure to File An Annual Report | 2018-08-24 |
201744797160 | Annual Report | 2017-06-05 |
201602627390 | Annual Report | 2016-07-26 |
201601664260 | Revocation Notice For Failure to File An Annual Report | 2016-07-07 |
201566347080 | Articles of Incorporation | 2015-07-28 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
343523619 | 0112300 | 2018-10-11 | 13 CUSHING STREET, PROVIDENCE, RI, 02906 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Complaint |
Activity Nr | 1390046 |
Health | Yes |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2017-05-18 |
Emphasis | L: EISAOF |
Case Closed | 2018-09-12 |
Related Activity
Type | Referral |
Activity Nr | 1218886 |
Safety | Yes |
Violation Items
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19100305 G01 IV C |
Issuance Date | 2017-06-09 |
Abatement Due Date | 2017-07-13 |
Current Penalty | 1900.0 |
Initial Penalty | 3803.0 |
Final Order | 2017-07-10 |
Nr Instances | 1 |
Nr Exposed | 2 |
Related Event Code (REC) | Referral |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.305(g)(1)(iv)(C): Flexible cords and cables were run through doorways, windows, or similar openings: (a) Jobsite at 17 New England Way: On or about 5-18-17, flexible extension cords were run through doorways, without blocking the door, exposing the cords to damage. |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19100332 B01 |
Issuance Date | 2017-06-09 |
Abatement Due Date | 2017-07-13 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2017-07-10 |
Nr Instances | 1 |
Nr Exposed | 2 |
Related Event Code (REC) | Referral |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.332(b)(1): Employees were not trained in and familiar with the safety-related work practices required by 1910.331 through 1910.335 that pertained to their respective job assignments: (a) Jobsite at 17 New England Way: On or about 5-18-17, the employer had not trained painters in safe electrical work practices, and the painters were not familiar with safe electrical work practices to protect them from electrical hazards pertaining to their job assignments, such as overhead power lines. |
Date of last update: 23 Oct 2024
Sources: Rhode Island Department of State