Search icon

SILVEIRA'S MASONRY, LLC

Company Details

Name: SILVEIRA'S MASONRY, LLC
Jurisdiction: Rhode Island
Entity type: Domestic Limited Liability Company
Status: Revoked Entity
Date of Organization in Rhode Island: 26 Feb 2007 (18 years ago)
Date of Dissolution: 22 Jul 2019 (6 years ago)
Date of Status Change: 22 Jul 2019 (6 years ago)
Identification Number: 000162045
ZIP code: 02888
County: Kent County
Principal Address: 65 GROVEDALE STREET, WARWICK, RI, 02888, USA
Purpose: REAL ESTATE

Industry & Business Activity

NAICS

238140 Masonry Contractors

This industry comprises establishments primarily engaged in masonry work, stone setting, bricklaying, and other stone work. The work performed may include new work, additions, alterations, maintenance, and repairs. Learn more at the U.S. Census Bureau

Agent

Name Role Address
JOHN S. DIBONA, ESQ. Agent 481 ATWOOD AVENUE, CRANSTON, RI, 02920, USA

MANAGER

Name Role Address
JOSE SILVEIRA MANAGER 65 GROVEDALE STREET WARWICK, RI 02888 USA

Filings

Number Name File Date
201906318570 Revocation Certificate For Failure to File the Annual Report for the Year 2019-07-22
201992889220 Revocation Notice For Failure to File An Annual Report 2019-05-13
201753913810 Annual Report 2017-11-24
201745033140 Statement of Change of Registered/Resident Agent Office 2017-06-07
201611997310 Annual Report 2016-11-10
201582436980 Annual Report 2015-10-13
201448963050 Annual Report 2014-10-28
201330221990 Annual Report 2013-10-31
201203839110 Annual Report 2012-11-08
201184795610 Annual Report 2011-11-01

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
343287447 0112300 2018-07-11 1920 MINERAL SPRING AVENUE, NORTH PROVIDENCE, RI, 02904
Inspection Type FollowUp
Scope NoInspection
Safety/Health Safety
Close Conference 2018-07-11
Emphasis L: FALL
Case Closed 2018-07-11

Related Activity

Type Inspection
Activity Nr 1307156
Safety Yes
343071569 0112300 2018-04-09 1920 MINERAL SPRING AVENUE, NORTH PROVIDENCE, RI, 02904
Inspection Type Complaint
Scope Partial
Safety/Health Safety
Close Conference 2018-04-09
Emphasis L: FALL
Case Closed 2019-09-30

Related Activity

Type Complaint
Activity Nr 1325675
Safety Yes
Health Yes

Violation Items

Citation ID 01001A
Citaton Type Serious
Standard Cited 19260451 B04
Issuance Date 2018-04-24
Current Penalty 2495.0
Initial Penalty 2495.0
Final Order 2018-06-04
Nr Instances 4
Nr Exposed 5
Related Event Code (REC) Complaint
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(4): Each end of a platform, not cleated or otherwise restrained by hooks or equivalent means, did not extend over the centerline of its support at least 6 inches (15 cm): (a) Worksite: On or about 4/9/2018, employees worked from a scaffold platform, where the planks did not extend at least six inches beyond the scaffold frame support.
Citation ID 01001B
Citaton Type Serious
Standard Cited 19260451 E09 IV
Issuance Date 2018-04-24
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2018-06-04
Nr Instances 2
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(e)(9)(iv): Cross braces on tubular welded frame scaffolds were used as a means of access or egress: (a) Worksite: On or about 4/9/2018, the employer did not prevent employees from using cross bracing and other scaffold components to climb and gain access to and from a scaffold system.
Citation ID 01001C
Citaton Type Serious
Standard Cited 19260451 F04
Issuance Date 2018-04-24
Abatement Due Date 2018-05-17
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2018-06-04
Nr Instances 27
Nr Exposed 5
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(f)(4): Part(s) of a scaffold that were damaged or weakened, such that the scaffold's strength was less than that required by paragraph (a) of this section, were not immediately repaired, replaced, braced to meet those provisions, nor removed from service until repaired: (a) Worksite: On or about 4/9/2018, the employer did not take split and rotted scaffold planks that were installed and being used as part of the scaffold system, out of service. The employer also did not use solid wood scaffold grade planks.
Citation ID 01001D
Citaton Type Serious
Standard Cited 19260452 C02
Issuance Date 2018-04-24
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2018-06-04
Nr Instances 8
Nr Exposed 5
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally: (a) Worksite: On or about 4/9/2018, the employer did not ensure that all scaffold cross-bracing was installed to support the framework and the intended load.
Citation ID 02001
Citaton Type Other
Standard Cited 19261153 G01
Issuance Date 2018-04-24
Abatement Due Date 2018-06-08
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2018-06-04
Nr Instances 1
Nr Exposed 3
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.1153(g)(1): The employer did not establish and implement a written silica exposure control plan: (a) Worksite: On or about 4/9/2018, the employer had not developed and implemented a written exposure control plan regarding work activities such as cutting brick or concrete block and mixing cement, where employees could be exposed to silica dust.

Date of last update: 10 Oct 2024

Sources: Rhode Island Department of State