All States Construction, Inc.

NAICS
237310 Highway, Street, and Bridge ConstructionThis industry comprises establishments primarily engaged in the construction of highways (including elevated), streets, roads, airport runways, public sidewalks, or bridges. The work performed may include new work, reconstruction, rehabilitation, and repairs. Specialty trade contractors are included in this industry if they are engaged in activities primarily related to highway, street, and bridge construction (e.g., installing guardrails on highways). Learn more at the U.S. Census Bureau
Name | Role | Address |
---|---|---|
CORPORATION SERVICE COMPANY | Agent | 222 JEFFERSON BOULEVARD SUITE 200, WARWICK, RI, 02888, USA |
Name | Role | Address |
---|---|---|
JEAN AZOURY | PRESIDENT | 11 INTERSTATE DRIVE, SUITE 301 WEST SPRINGFIELD, MA 01089 USA |
Name | Role | Address |
---|---|---|
SETH M. HANKOWSKI | DIRECTOR | 11 INTERSTATE DR SUITE 301 WEST SPRINGFIELD,, MA 01089 USA |
MARK A. HANKOWSKI | DIRECTOR | 11 INTERSTATE DRIVE, SUITE 301 WEST SPRINGFIELD, MA 01089 USA |
DAVID M. HANKOWSKI | DIRECTOR | 11 INTERSTATE DR SUITE 301 WEST SPRINGFIELD,, MA 01089 USA |
AARON D. HANKOWSKI | DIRECTOR | 11 INTERSTATE DRIVE,SUITE 301 WEST SPRINGFIELD, MA 01089 USA |
Name | Role | Address |
---|---|---|
SETH M. HANKOWSKI | CEO,DIRECTOR | 11 INTERSTATE DR, SUITE 301 WEST SPRINGFIELD, MA 01089 USA |
Name | Role | Address |
---|---|---|
CRAIG S. REED | SECRETARY,TREASURER | 11 INTERSTATE DR, SUITE 301 WEST SPRINGFIELD, MA 01089 USA |
Type | Date | Old Value | New Value |
---|---|---|---|
Name Change | 2020-11-24 | All States Asphalt, Inc. | All States Construction, Inc. |
Number | Name | File Date |
---|---|---|
202452938300 | Annual Report | 2024-04-29 |
202336808840 | Annual Report - Amended | 2023-06-14 |
202334396790 | Annual Report | 2023-04-28 |
202216823570 | Annual Report | 2022-05-04 |
202192573980 | Annual Report | 2021-02-23 |
PO No. | Bid No. | Date | Agency | Description | Amount |
---|---|---|---|---|---|
3888264 | TCB24003665 | 2024-05-07 | Transportation, Department Of | RIDOT: 2024-CR-009 2024 RUBBERIZED ASPHALT CHIP SEAL C-1 - A | $1,574,543.38 |
3674039 | 7602781 | 2020-04-09 | Transportation, Department Of | DOT; 2020-CR-012 RUBBERIZED ASPHALT CHIP SEAL C-1 | $1,171,871.06 |
3624570 | 7598697 | 2019-05-14 | Transportation, Department Of | DOT; 2019-CR-038 2019 RUBBERIZED ASPHALT CHIP SEALING C-2 | $1,525,564.31 |
3617040 | 7598582 | 2019-03-27 | Transportation, Department Of | DOT; 2018-CR-101 RUBBERIZED ASPHALT CHIP SEALING C-1 | $1,039,640.36 |
3579250 | 7592771 | 2018-07-24 | Transportation, Department Of | 2018 RUBBERIZED ASPHALT CHIP SEAL C-2 2017-CR-063 | $1,608,071.96 |
Agency | Date | Program | Subprogram | Amount |
---|---|---|---|---|
Department of Transportation | 2024-12-17 | INFRASTRUCTURE-ENGINEERING | Operations | 164626.33 |
Department of Transportation | 2024-09-17 | INFRASTRUCTURE-ENGINEERING | Operations | 807816.03 |
Department of Transportation | 2024-08-27 | INFRASTRUCTURE-ENGINEERING | Operations | 100.0 |
Department of Transportation | 2024-08-13 | INFRASTRUCTURE-ENGINEERING | Operations | 321182.42 |
Department of Transportation | 2024-07-16 | INFRASTRUCTURE-ENGINEERING | Operations | 10593.46 |
This company hasn't received any reviews.
Date of last update: 21 May 2025
Sources: Rhode Island Department of State