Plant 7
|
Surface
|
Active
|
Crushed, Broken Granite
|
|
Directions to Mine |
I95N to Exit 1, rt350 to left on Hopkinton Rd. Go under highway plant 100 yds on left.
|
Parties
Name
|
Rawson Materials
|
Role
|
Operator
|
Start Date
|
2018-03-07
|
|
Name
|
Cherenzia Excavation Inc
|
Role
|
Operator
|
Start Date
|
1990-06-01
|
End Date
|
2018-03-06
|
|
Name
|
O & G Industries Inc
|
Role
|
Current Controller
|
Start Date
|
2018-03-07
|
|
Name
|
Rawson Materials
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2018-05-23
|
Degree Inhury |
INJURIES INVOLVNG NONEMPLOYEES
|
Accident Type |
Struck by flying object
|
Ocupation |
Clerk, Timekeeper, Office worker, Director of sales
|
Narrative |
Blasted rock was ejected from the blast. 3 buildings and 8 vehicles were hit. Another vehicle with 2 occupants was also hit. They were taken to hospital. injured #1 was released that day. The other was released the next day.
|
|
Accident Date |
2018-05-23
|
Degree Inhury |
INJURIES INVOLVNG NONEMPLOYEES
|
Accident Type |
Struck by flying object
|
Ocupation |
Clerk, Timekeeper, Office worker, Director of sales
|
Narrative |
Blasted rock was ejected from the blast. 3 buildings and 8 vehicles were hit. Another vehicle with 2 occupants was also hit. They were taken to hospital. injured #1 was released that day. The Injured #2 was released the next day.
|
|
Accident Date |
2016-08-29
|
Degree Inhury |
DYS AWY FRM WRK & RESTRCTD ACT
|
Accident Type |
Struck against a moving object
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
Employee was operating a loader and was jostled around - resulting in a groin strain,
|
|
Accident Date |
2015-03-31
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall to the walkway or working surface
|
Ocupation |
Assistant mine foreman, Assistant mine manager
|
Narrative |
Employee had a confrontation with another employee. At this time the injured employee was shoved to the ground by the other person causing him to land on right shoulder.
|
|
Accident Date |
2009-10-28
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
EE was cutting tie wrap with a utility knife (box cutter), when knife slipped an dcut palm of left hand.
|
|
Accident Date |
2008-09-11
|
Degree Inhury |
INJURIES INVOLVNG NONEMPLOYEES
|
Accident Type |
NEC
|
Ocupation |
Miner, Prospector, NEC
|
Narrative |
Unidentified man found hanging in a tree (apparent suicide).
|
|
Accident Date |
2008-07-07
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion in pulling or pushing objects
|
Ocupation |
Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator
|
Narrative |
Employee was pushing a steel plate into place when he felt a pop in his left wrist.
|
|
Inspections
Start Date |
2024-07-22
|
End Date |
2024-07-24
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
10.25
|
|
Start Date |
2024-07-10
|
End Date |
2024-07-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17.75
|
|
Start Date |
2024-02-20
|
End Date |
2024-02-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14
|
|
Start Date |
2023-08-12
|
End Date |
2023-08-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17.25
|
|
Start Date |
2023-02-01
|
End Date |
2023-02-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13
|
|
Start Date |
2022-05-11
|
End Date |
2022-05-12
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
18
|
|
Start Date |
2022-02-08
|
End Date |
2022-02-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
19.25
|
|
Start Date |
2021-05-06
|
End Date |
2021-05-10
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17.75
|
|
Start Date |
2021-02-09
|
End Date |
2021-02-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13
|
|
Start Date |
2020-07-15
|
End Date |
2020-07-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Start Date |
2020-07-14
|
End Date |
2020-07-16
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
22.75
|
|
Start Date |
2020-02-18
|
End Date |
2020-02-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
27.5
|
|
Start Date |
2019-07-29
|
End Date |
2019-07-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
20
|
|
Start Date |
2019-01-07
|
End Date |
2019-01-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
33.25
|
|
Start Date |
2018-08-30
|
End Date |
2018-08-31
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14.5
|
|
Start Date |
2018-05-24
|
End Date |
2018-06-14
|
Activity |
Non-Fatal Accident Investigation
|
Number Inspectors |
1
|
Total Hours |
71.25
|
|
Start Date |
2018-01-29
|
End Date |
2018-01-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14.75
|
|
Start Date |
2017-07-18
|
End Date |
2017-07-19
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14
|
|
Start Date |
2017-03-23
|
End Date |
2017-03-23
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
2.5
|
|
Start Date |
2017-02-28
|
End Date |
2017-03-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
21.5
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
26464
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
13
|
Avg. Employee Hours
|
2036
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2024
|
Annual Hours
|
0
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
0
|
Avg. Employee Hours
|
0
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
0
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
0
|
Avg. Employee Hours
|
0
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
16739
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
2790
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2023
|
Annual Hours
|
6542
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
3271
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2023
|
Annual Hours
|
690
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
690
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
24240
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
2204
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2022
|
Annual Hours
|
1500
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
500
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
2185
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2185
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
28559
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
2596
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
3355
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1678
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
30633
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
12
|
Avg. Employee Hours
|
2553
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2020
|
Annual Hours
|
700
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
700
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
2490
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2490
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
27468
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
2497
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
4782
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2391
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
19093
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2728
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2018
|
Annual Hours
|
2450
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2450
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
33939
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
21
|
Avg. Employee Hours
|
1616
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2017
|
Annual Hours
|
4458
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1486
|
|
|
White Rock Quarry
|
Surface
|
Abandoned
|
Crushed, Broken Stone NEC
|
|
Directions to Mine |
I95 South Exit 92 in CT, left on Rte 49, left Rte 2, left on White Rock/Bridge Rd, left on White Rock Rd, follow to White Rock Quarry at end of road
|
Parties
Name
|
Rawson Materials
|
Role
|
Operator
|
Start Date
|
2018-03-07
|
|
Name
|
Cherenzia Excavation Inc
|
Role
|
Operator
|
Start Date
|
2000-06-01
|
End Date
|
2018-03-06
|
|
Name
|
O & G Industries Inc
|
Role
|
Current Controller
|
Start Date
|
2018-03-07
|
|
Name
|
Rawson Materials
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2006-06-26
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Over-exertion in pulling or pushing objects
|
Ocupation |
Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator
|
Narrative |
Applying pressure with a pry bar to position a motor mount, he felt a pain in his left shoulder causing a left should strain.
|
|
Accident Date |
2004-03-23
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Caught in, under or between a moving and a stationary object
|
Ocupation |
Haul/Off road/Coal/Ore/Pit/Quarry/Rock/Rubber tire truck driver, Transportation truck driver
|
Narrative |
LOWBED DRIVER WAS PREPARING TO LEAVE PREMISIS. HE LIFTED LOWBED DECK WITH GOOSNECK, WHEN BRAKE SECURING LIFT DECK FAILED & SHIFTED & FELL DOWN. EE COULD NOT MOVE HIS FOOT COMPLETLY OUT OF THE WAY. DECK OF LOWBED FELL ON EE'S RIGHT FOOT BREAKING HIS BIG TOE.
|
|
Inspections
Start Date |
2022-02-07
|
End Date |
2022-02-08
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
5.75
|
|
Start Date |
2021-05-10
|
End Date |
2021-05-10
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
2
|
|
Start Date |
2021-02-11
|
End Date |
2021-02-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.5
|
|
Start Date |
2020-02-26
|
End Date |
2020-02-26
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5.5
|
|
Start Date |
2019-04-15
|
End Date |
2019-04-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2018-04-24
|
End Date |
2018-04-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14.5
|
|
Start Date |
2018-02-28
|
End Date |
2018-02-28
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2017-07-25
|
End Date |
2017-07-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.5
|
|
Start Date |
2017-02-15
|
End Date |
2017-02-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2016-08-12
|
End Date |
2016-08-12
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2016-03-02
|
End Date |
2016-03-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
20
|
|
Start Date |
2015-05-27
|
End Date |
2015-05-27
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
2.5
|
|
Start Date |
2015-05-13
|
End Date |
2015-05-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14.25
|
|
Start Date |
2015-04-14
|
End Date |
2015-04-14
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
3.75
|
|
Start Date |
2015-02-11
|
End Date |
2015-02-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
18.75
|
|
Start Date |
2015-02-11
|
End Date |
2015-02-11
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
2.25
|
|
Start Date |
2013-09-04
|
End Date |
2013-10-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
18
|
|
Start Date |
2013-05-13
|
End Date |
2013-05-16
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
10.5
|
|
Start Date |
2013-04-23
|
End Date |
2013-04-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.25
|
|
Start Date |
2011-11-30
|
End Date |
2011-12-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
1
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
541
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
541
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
4094
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1365
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
853
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
853
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
2559
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1280
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
1139
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
570
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
4859
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1620
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2018
|
Annual Hours
|
3012
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1506
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
10318
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1720
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2017
|
Annual Hours
|
209
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
209
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
9120
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1520
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2016
|
Annual Hours
|
42
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
42
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
15013
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2145
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2015
|
Annual Hours
|
784
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
784
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
14353
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2050
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2014
|
Annual Hours
|
1026
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
513
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
7567
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1261
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2013
|
Annual Hours
|
664
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
664
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2012
|
Annual Hours
|
7423
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1856
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2012
|
Annual Hours
|
885
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
443
|
|
|
Plant 8
|
Surface
|
Abandoned
|
Construction Sand and Gravel
|
|
Directions to Mine |
I95 South to RI exit 1. Right on Rte 3 left on Rte 216. Bear left at fork, Mine 1/2 mile on right. 271 Church Street Westerly, RI.
|
Parties
Name
|
Rawson Materials
|
Role
|
Operator
|
Start Date
|
2018-03-07
|
|
Name
|
CHERENZIA EXCAVATION INC.
|
Role
|
Operator
|
Start Date
|
2016-01-27
|
End Date
|
2018-03-06
|
|
Name
|
O & G Industries Inc
|
Role
|
Current Controller
|
Start Date
|
2018-03-07
|
|
Name
|
Rawson Materials
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2020-09-02
|
End Date |
2020-09-02
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
4.25
|
|
Start Date |
2019-04-16
|
End Date |
2019-04-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
30
|
|
Start Date |
2018-08-31
|
End Date |
2018-08-31
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2017-02-23
|
End Date |
2017-02-24
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Start Date |
2016-08-11
|
End Date |
2016-08-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6.75
|
|
Start Date |
2016-01-27
|
End Date |
2016-01-27
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
6.25
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
86
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
86
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
896
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
448
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
3302
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
550
|
|
|