Search icon

Cool Polymers, Inc.

Company Details

Name: Cool Polymers, Inc.
Jurisdiction: Rhode Island
Entity type: Foreign Corporation
Status: Revoked Entity
Date of Organization in Rhode Island: 10 Feb 2000 (25 years ago)
Date of Dissolution: 02 Nov 2017 (7 years ago)
Date of Status Change: 02 Nov 2017 (7 years ago)
Identification Number: 000110923
Place of Formation: NEW HAMPSHIRE
Principal Address: 179 MOUNTAIN ROAD UNIT 3, CONCORD, NH, 03301, USA
Purpose: TO MANUFACTURE AND MARKET ELECTRONIC HARDWARE AND RELATED PRODUCTS.

form 5500

Plan Name Plan Year EIN/PN Received Sponsor Total number of participants
COOL PLYMERS INC. 401(K) PROFIT SHARING PLAN AND TRUST 2015 020513558 2018-06-13 COOL POLYMERS INC. 25
File View Page
Three-digit plan number (PN) 001
Effective date of plan 2011-01-01
Business code 325900
Sponsor’s telephone number 4016677830
Plan sponsor’s address 51 CIRCUIT DR, NORTH KINGSTOWN, RI, 028527435

Signature of

Role Plan administrator
Date 2018-06-13
Name of individual signing KEVIN MCCULLOUGH
Valid signature Filed with authorized/valid electronic signature
Role Employer/plan sponsor
Date 2018-06-13
Name of individual signing KEVIN MCCULLOUGH
Valid signature Filed with authorized/valid electronic signature
COOL POLYMERS INC 401 K PROFIT SHARING PLAN TRUST 2014 020513558 2015-05-14 COOL POLYMERS INC 24
File View Page
Three-digit plan number (PN) 001
Effective date of plan 2011-01-01
Business code 325900
Sponsor’s telephone number 4016677830
Plan sponsor’s address 51 CIRCUIT DR, NORTH KINGSTOWN, RI, 028527435

Signature of

Role Plan administrator
Date 2015-05-14
Name of individual signing JESSICA WEIMAR
Valid signature Filed with authorized/valid electronic signature
COOL POLYMERS INC 401 K PROFIT SHARING PLAN TRUST 2013 020513558 2014-05-22 COOL POLYMERS INC 21
File View Page
Three-digit plan number (PN) 001
Effective date of plan 2011-01-01
Business code 325900
Sponsor’s telephone number 4016677830
Plan sponsor’s address 51 CIRCUIT DR, NORTH KINGSTOWN, RI, 028527435

Signature of

Role Plan administrator
Date 2014-05-22
Name of individual signing JESSICA WEIMAR
Valid signature Filed with authorized/valid electronic signature
COOL POLYMERS INC 401 K PROFIT SHARING PLAN TRUST 2012 020513558 2013-05-21 COOL POLYMERS INC 16
File View Page
Three-digit plan number (PN) 001
Effective date of plan 2011-01-01
Business code 325900
Sponsor’s telephone number 4016677830
Plan sponsor’s address 51 CIRCUIT DR, NORTH KINGSTOWN, RI, 028527435

Signature of

Role Plan administrator
Date 2013-05-21
Name of individual signing COOL POLYMERS INC
Valid signature Filed with authorized/valid electronic signature
COOL POLYMERS INC 401 K PROFIT SHARING PLAN TRUST 2011 020513558 2012-06-05 COOL POLYMERS INC 16
File View Page
Three-digit plan number (PN) 001
Effective date of plan 2011-01-01
Business code 325900
Sponsor’s telephone number 4016677830
Plan sponsor’s address 51 CIRCUIT DR, NORTH KINGSTOWN, RI, 028527435

Plan administrator’s name and address

Administrator’s EIN 020513558
Plan administrator’s name COOL POLYMERS INC
Plan administrator’s address 51 CIRCUIT DR, NORTH KINGSTOWN, RI, 028527435
Administrator’s telephone number 4016677830

Signature of

Role Plan administrator
Date 2012-06-05
Name of individual signing COOL POLYMERS INC
Valid signature Filed with authorized/valid electronic signature

Agent

Name Role Address
ORSON AND BRUSINI LTD. Agent 144 WAYLAND AVENUE, PROVIDENCE, RI, 02906, USA

PRESIDENT

Name Role Address
PHILIP A JOHNSON PRESIDENT 179 MOUNTAIN RD UNIT 3 CONCORD, NH 03301 USA

SECRETARY

Name Role Address
ELIZABETH F JOHNSON SECRETARY 179 MOUNTAIN ROAD UNIT 3 CONCORD, NH 03301 USA

VICE PRESIDENT

Name Role Address
PHILIP A JOHNSON VICE PRESIDENT 179 MOUNTAIN ROAD UNIT 3 CONCORD, NH 03301 USA

DIRECTOR

Name Role Address
PHILIP A JOHNSON DIRECTOR 179 MOUNTAIN ROAD UNIT 3 CONCORD, NH 03301 USA

Filings

Number Name File Date
201752770900 Revocation Certificate For Failure to File the Annual Report for the Year 2017-11-02
201747758050 Revocation Notice For Failure to File An Annual Report 2017-07-27
201601967820 Annual Report 2016-07-13
201601434250 Revocation Notice For Failure to File An Annual Report 2016-07-07
201558140970 Annual Report 2015-03-27
201436932240 Annual Report 2014-03-10
201320491530 Annual Report 2013-05-14
201295760640 Statement of Change of Registered/Resident Agent 2012-08-02
201295045440 Revocation Notice For Failure to Maintain a Registered Agent 2012-07-25
201294021120 Agent Resigned 2012-06-14

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
336996194 0112300 2012-10-19 51 CIRCUIT DRIVE, NORTH KINGSTOWN, RI, 02852
Inspection Type Complaint
Scope Partial
Safety/Health Safety
Close Conference 2012-10-22
Emphasis L: FORKLIFT, N: AMPUTATE
Case Closed 2014-09-30

Related Activity

Type Complaint
Activity Nr 625430
Safety Yes
Health Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 5A0001
Issuance Date 2013-04-11
Abatement Due Date 2013-04-15
Current Penalty 2500.0
Initial Penalty 3500.0
Final Order 2013-05-06
Nr Instances 1
Nr Exposed 1
Related Event Code (REC) Complaint
Gravity 5
FTA Current Penalty 0.0
Citation text line OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to crushing hazards: Location: Cool Polymers, Inc., North Kingstown, RI: Employees operating powered industrial trucks were not made to wear the attached seat belts.
Citation ID 01002A
Citaton Type Other
Standard Cited 19100147 C04 I
Issuance Date 2013-04-11
Abatement Due Date 2013-07-09
Current Penalty 0.0
Initial Penalty 4900.0
Final Order 2013-05-06
Nr Instances 1
Nr Exposed 3
Related Event Code (REC) Complaint
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: Establishment: The employer did not develop, document, and utilize machine specific procedures for the control of potentially hazardous energy in the following instances: (a) Zhafir 260 ton injection molding machine did not have specific procedures to control the hazards of electrical energy and pneumatic pressure. (b) Haitian HTW188 injection molding machine did not have specific procedures to control the hazards of electrical energy, pneumatic pressure, and hydraulic pressure. Abatement note: An energy control procedure must clearly and specifically outline the steps to be followed by the authorized employee(s) in such detail so that they know how to safely accomplish the energy control tasks.
Citation ID 01002B
Citaton Type Other
Standard Cited 19100333 B02
Issuance Date 2013-04-11
Abatement Due Date 2013-07-09
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2013-05-06
Nr Instances 1
Nr Exposed 3
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.333(b)(2): While an employee was exposed to contact with parts of fixed electric equipment or circuits which were deenergized, the circuits energizing the parts were not locked out or tagged or both in accordance with the requirements of this paragraph (b) of 29 CFR 1910.333(b)(2): Molding Department: The employer did not develop, document, and utilize machine specific procedures for the control of potentially hazardous energy in the following instances: (a) Zhafir 260 ton injection molding machine did not have specific procedures for the control of the electrical hazards during maintenance and servicing. (b) Haitian HTW188 injection molding machine did not have specific procedures for the control of the electrical hazards during maintenance and servicing.
Citation ID 01003
Citaton Type Other
Standard Cited 19100147 C06 I
Issuance Date 2013-04-11
Abatement Due Date 2013-07-09
Current Penalty 0.0
Initial Penalty 4900.0
Final Order 2013-05-06
Nr Instances 1
Nr Exposed 3
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: Establishment: On or about 10/19/2012 the employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. ABATEMENT NOTE: The periodic inspection shall be documented through a written certification that identifies the machine or equipment on which the energy control procedure was being utilized, the date of the inspection, the employees included in the inspection, and the person performing the inspection.
Citation ID 01004
Citaton Type Other
Standard Cited 19100147 C08
Issuance Date 2013-04-11
Abatement Due Date 2013-07-09
Current Penalty 0.0
Initial Penalty 4900.0
Final Order 2013-05-06
Nr Instances 1
Nr Exposed 3
Related Event Code (REC) Complaint
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.147(c)(8): Lockout or tagout was not performed only by the authorized employees who are performing the servicing or maintenance: Establishment: On or about 10/19/2012 employees not identified as authorized employees were allowed to apply lockout devices on equipment whereby the employees were not designated and trained as authorized employees.
Citation ID 01005
Citaton Type Serious
Standard Cited 19100178 L01 I
Issuance Date 2013-04-11
Abatement Due Date 2013-05-24
Current Penalty 3000.0
Initial Penalty 3500.0
Final Order 2013-05-06
Nr Instances 1
Nr Exposed 7
Related Event Code (REC) Complaint
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.178(l)(1)(i): The employer did not ensure that each powered industrial truck operator is competent to operate a powered industrial truck safely, as demonstrated by the successful completion of the training and evaluation specified in this paragraph (l): Establishment: On or about 10/19/2012 employees were allowed to operate the Toyota forklift and the Ruger Electric Pallet Jack whereby the employees did not complete training and evaluation as required by this standard.
Citation ID 01006
Citaton Type Serious
Standard Cited 19100178 N07 III
Issuance Date 2013-04-11
Abatement Due Date 2013-04-19
Current Penalty 2500.0
Initial Penalty 2800.0
Final Order 2013-05-06
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.178(n)(7)(iii): On all grades the load and load engaging means was not tilted back if applicable, and raised only as far as necessary to clear the road surface: Establishment: On or about 10/19/2012 the operator did not ensure that during travel with a load the load engaging means was tilted back on the Toyota forklift.
Citation ID 02001
Citaton Type Other
Standard Cited 19100134 C02 II
Issuance Date 2013-04-11
Abatement Due Date 2013-05-24
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2013-05-06
Nr Instances 1
Nr Exposed 3
Related Event Code (REC) Complaint
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.134(c)(2)(ii): The employer did not establish and implement those elements of a written program necessary to ensure that any employee using a respirator voluntarily was medically able to use that respirator, and that the respirator was cleaned, stored, and maintained so that its use does not present a health hazard to the user: Compounding Department: On or about 10/19/2013, where employees are allowed to voluntarily use respirators, the employer did not develop and implement those elements of a written respiratory protection program necessary to ensure that any employee using a respirator voluntarily is medically able to use that respirator, and that the respirator is cleaned, stored, and maintained so that its use does not present a health hazard to the user.
Citation ID 02002
Citaton Type Other
Standard Cited 19100178 Q07
Issuance Date 2013-04-11
Abatement Due Date 2013-04-19
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2013-05-06
Nr Instances 1
Nr Exposed 6
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.178(q)(7): Industrial trucks were not examined before being placed in service: Establishment: On or about 10/19/2012 forklift operators were operating forklifts whereby daily inspections were not performed on the Toyota forklift and the Ruger Electric Pallet Jack .

Date of last update: 10 Apr 2025

Sources: Rhode Island Department of State