Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260020 B02 |
Issuance Date |
2019-04-15 |
Abatement Due Date |
2019-05-01 |
Current Penalty |
6500.0 |
Initial Penalty |
9282.0 |
Final Order |
2019-05-08 |
Nr Instances |
3 |
Nr Exposed |
11 |
Related Event Code (REC) |
Referral |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.20(b)(2): The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person: (a) Throughout the building: On or about 11/1/2018, 11/27/2018, and 11/30/2018, the employer did not initiate and maintain a program that provided frequent and regular inspections of the jobsite by a competent person, exposing workers to numerous health and safety hazards. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260025 A |
Issuance Date |
2019-04-15 |
Abatement Due Date |
2019-04-22 |
Current Penalty |
0.0 |
Initial Penalty |
9282.0 |
Final Order |
2019-05-08 |
Nr Instances |
3 |
Nr Exposed |
11 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.25(a): During the course of construction, alteration, or repairs, debris was not kept cleared from work areas, passageways, and stairs, in and around buildings or other structures: (a) Throughout the building: On or about 11/1/2018, 11/27/2018, and 11/30/2018, construction debris was not kept cleared from the work areas and passageways in the building. |
|
Citation ID |
01003A |
Citaton Type |
Serious |
Standard Cited |
19260150 A01 |
Issuance Date |
2019-04-15 |
Abatement Due Date |
2019-04-22 |
Current Penalty |
6500.0 |
Initial Penalty |
9282.0 |
Final Order |
2019-05-08 |
Nr Instances |
1 |
Nr Exposed |
12 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.150(a)(1): The employer did not develop and maintain a fire protection program to be followed throughout all phases of construction and demolition work, and/or did not provide for the firefighting equipment as specified in this subpart: (a) On the 3rd floor: On or about 11/1/2018, the employer did not have an effective fire protection plan, in that sparks from operations on the 5th floor were allowed to fall onto debris on the 3rd floor, causing the debris to smolder. |
|
Citation ID |
01003B |
Citaton Type |
Serious |
Standard Cited |
19260150 A02 |
Issuance Date |
2019-04-15 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2019-05-08 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.150(a)(2): Access to all available firefighting equipment was not maintained at all times: (a) On the 3rd floor: On or about 10/23/2018, the only serviceable portable fire extinguisher in the area was blocked by a sheet of plywood. |
|
Citation ID |
01003C |
Citaton Type |
Serious |
Standard Cited |
19260150 A04 |
Issuance Date |
2019-04-15 |
Abatement Due Date |
2019-04-19 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2019-05-08 |
Nr Instances |
7 |
Nr Exposed |
8 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.150(a)(4): All firefighting equipment was not periodically inspected and maintained in operating condition. Defective equipment was not immediate replaced: (a) Throughout the 5-story building: On or about 10/23/208, numerous unserviceable and expended fire extinguishers were found throughout the building. |
|
Citation ID |
01004A |
Citaton Type |
Other |
Standard Cited |
19260403 I02 I |
Issuance Date |
2019-04-15 |
Abatement Due Date |
2019-04-19 |
Current Penalty |
6500.0 |
Initial Penalty |
9282.0 |
Final Order |
2019-05-08 |
Nr Instances |
2 |
Nr Exposed |
20 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.403(i)(2)(i): Live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by cabinets or other forms of enclosures, nor by any of the means listed in subparagraphs (A) through (D) of this paragraph: (a) On the first floor: On or about 10/23/2018, the fuse panel had an unguarded slot where a circuit breaker had been removed, exposing live electrical parts. (b) On the 3rd floor: On or about 10/23/2018, a bulb was missing from the socket on a string of temporary lighting, hanging approximately chest high, exposing live electrical parts. |
|
Citation ID |
01004B |
Citaton Type |
Other |
Standard Cited |
19260405 A02 II E |
Issuance Date |
2019-04-15 |
Abatement Due Date |
2019-04-19 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2019-05-08 |
Nr Instances |
1 |
Nr Exposed |
2 |
Related Event Code (REC) |
Referral |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.405(a)(2)(ii)(E): Lamps used in temporary wiring for general illumination were not protected from accidental contact or breakage: (a) On the 1st, 3rd and 4th floor: On or about 10/23/2018, lamps used for temporary lighting, with broken and missing bulbs, were hanging less than 4 feet above the ground and were not protected from contact or breakage. |
|
Citation ID |
01005A |
Citaton Type |
Serious |
Standard Cited |
19260501 A02 |
Issuance Date |
2019-04-15 |
Abatement Due Date |
2019-04-19 |
Current Penalty |
0.0 |
Initial Penalty |
9282.0 |
Contest Date |
2019-05-08 |
Final Order |
2020-01-05 |
Nr Instances |
1 |
Nr Exposed |
3 |
Related Event Code (REC) |
Referral |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.501(a)(2): The employer did not determine if the walking/working surfaces on which its employees were to work on, had the strength and structure integrity to support employees safely: (a) At the northwest corner of the 3rd floor: On or about 10/22/2018, the employer did not determine that the walking/working surface on which the workers were working had the strength and structural integrity to support them safely, in that the floor was loaded with scrap concrete and construction debris, causing it to collapse down to the 1st floor of the building. |
|
Citation ID |
01005B |
Citaton Type |
Serious |
Standard Cited |
19260857 A |
Issuance Date |
2019-04-15 |
Abatement Due Date |
2019-04-19 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Contest Date |
2019-05-08 |
Final Order |
2020-01-05 |
Nr Instances |
1 |
Nr Exposed |
3 |
Related Event Code (REC) |
Referral |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.857(a): Storage of waste material and debris on the floor exceeded the allowable floor loads: (a) In the northwest corner of the 3rd floor: On or about 10/22/2018, , pre-positioned metal, wood and concrete debris exceeded the allowable floor loads, causing the 3rd floor to collapse to the 1st floor. |
|
Citation ID |
01006A |
Citaton Type |
Serious |
Standard Cited |
19260501 B04 I |
Issuance Date |
2019-04-15 |
Abatement Due Date |
2019-04-19 |
Current Penalty |
6500.0 |
Initial Penalty |
9282.0 |
Final Order |
2019-05-08 |
Nr Instances |
1 |
Nr Exposed |
9 |
Related Event Code (REC) |
Referral |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.501(b)(4)(i): Each employee on walking/working surfaces was not protected from falling through holes (including skylights) more than 6 feet (1.8 m) above lower levels, by personal fall arrest systems, covers, or guardrail systems erected around such holes: (a) Throughout the building: On or about 11/1/2018, employees on walking/working surfaces were exposed to unprotected holes in the floor, which were approximately 12-15 feet above the next lower level. |
|
Citation ID |
01006B |
Citaton Type |
Serious |
Standard Cited |
19260502 I04 |
Issuance Date |
2019-04-15 |
Abatement Due Date |
2019-04-19 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2019-05-08 |
Nr Instances |
1 |
Nr Exposed |
30 |
Related Event Code (REC) |
Referral |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.502(i)(4): All covers were not color coded or marked with the word "HOLE" or "COVER" to provide warning of the hazard: (a) Throughout the building: On or about 10/23/2018, floor holes that were covered were not marked "Hole" or "Cover" to warn of the hazard. |
|
Citation ID |
01007A |
Citaton Type |
Serious |
Standard Cited |
19260502 D01 |
Issuance Date |
2019-04-15 |
Current Penalty |
6500.0 |
Initial Penalty |
9282.0 |
Final Order |
2019-05-08 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.502(d)(1): Personal fall arrest system connectors were not drop forged, pressed or formed steel, or made of equivalent materials: (a) On the north end of the 5th floor: On or about 11/1/2018, the fall arrest system connector was not drop forged, in that a rope was tied to the anchorage point of the roofing bracket. |
|
Citation ID |
01007B |
Citaton Type |
Serious |
Standard Cited |
19260502 D15 |
Issuance Date |
2019-04-15 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2019-05-08 |
Nr Instances |
3 |
Nr Exposed |
6 |
Related Event Code (REC) |
Referral |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.502(d)(15): Anchorages used for attachment of personal fall arrest equipment were not independent of any anchorage being used to support or suspend platforms and/or were not capable of supporting at least 5,000 pounds per employee: (a) On the 5th floor: On or about 11/1/2018, employees misused roofing brackets attached to round columns, which was not what they were designed or intended to be used for. |
|