Search icon

Contract Fusion, Inc.

Company Details

Name: Contract Fusion, Inc.
Jurisdiction: Rhode Island
Entity type: Domestic Profit Corporation
Status: Activ
Date of Organization in Rhode Island: 25 Sep 1991 (34 years ago)
Identification Number: 000065685
ZIP code: 02914
County: Providence County
Principal Address: 99 MASSASOIT AVENUE, EAST PROVIDENCE, RI, 02914, USA
Purpose: FUSION WELDING SERVICES, MARKETING OF FUSION WELDERS AND RELATED PRODUCTS

Industry & Business Activity

NAICS

339910 Jewelry and Silverware Manufacturing

This industry comprises establishments primarily engaged in one or more of the following: (1) manufacturing, engraving, chasing, or etching jewelry; (2) manufacturing, engraving, chasing, or etching metal personal goods (i.e., small articles carried on or about the person, such as compacts or cigarette cases); (3) manufacturing, engraving, chasing, or etching precious metal solid, precious metal clad, or pewter flatware and other hollowware; (4) stamping coins; (5) manufacturing unassembled jewelry parts and stock shop products, such as sheet, wire, and tubing; (6) cutting, slabbing, tumbling, carving, engraving, polishing, or faceting precious or semiprecious stones and gems; (7) recutting, repolishing, and setting gem stones; and (8) drilling, sawing, and peeling cultured and costume pearls. This industry includes establishments primarily engaged in manufacturing precious solid, precious clad, and precious plated jewelry and personal goods. Learn more at the U.S. Census Bureau

Agent

Name Role Address
JOHN CARTER, III Agent 99 MASSASOIT AVENUE, EAST PROVIDENCE, RI, 02914, USA

PRESIDENT

Name Role Address
JOHN S CARTER III PRESIDENT 99 MASSASOIT AVENUE EAST PROVIDENCE, RI 02914 USA

Filings

Number Name File Date
202454069020 Annual Report 2024-04-30
202328746080 Annual Report 2023-02-15
202215337870 Annual Report 2022-04-13
202189287720 Annual Report 2021-02-01
202032714210 Annual Report 2020-01-15
201985629060 Annual Report 2019-01-30
201859210660 Annual Report 2018-02-26
201734621620 Annual Report 2017-02-21
201692590200 Annual Report 2016-02-16
201555679770 Annual Report 2015-02-13

USAspending Awards. Contracts

Contract Type Award or IDV Flag PIID Start Date Current End Date Potential End Date
PO AWARD N0017310P0419 2010-01-26 2010-02-25 2010-02-25
Unique Award Key CONT_AWD_N0017310P0419_9700_-NONE-_-NONE-
Awarding Agency Department of Defense
Link View Page

Description

Title CUMBAL TITANIUM
NAICS Code 332999: ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING
Product and Service Codes 6685: PRESSURE TEMP HUMIDITY INSTRUMENTS

Recipient Details

Recipient CONTRACT FUSION INC
UEI TF5MFSNWMEF5
Legacy DUNS 786188698
Recipient Address 99 MASSASOIT AVE, EAST PROVIDENCE, 029142008, UNITED STATES
PO AWARD N0017308P1151 2008-08-07 2008-08-21 2008-08-21
Unique Award Key CONT_AWD_N0017308P1151_9700_-NONE-_-NONE-
Awarding Agency Department of Defense
Link View Page

Description

Title CYMBAL TITANIUM
NAICS Code 332999: ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING
Product and Service Codes 9390: MISC FABRICATED NONMETAL MATERIALS

Recipient Details

Recipient CONTRACT FUSION INC
UEI TF5MFSNWMEF5
Legacy DUNS 786188698
Recipient Address 99 MASSASOIT AVE, EAST PROVIDENCE, 029142008, UNITED STATES

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
343919817 0112300 2019-04-10 99 MASSASOIT AVENUE, EAST PROVIDENCE, RI, 02914
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2019-04-10
Emphasis L: EISAOF, N: AMPUTATE, P: AMPUTATE
Case Closed 2019-06-10

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19100132 D01
Issuance Date 2019-04-24
Abatement Due Date 2019-06-10
Current Penalty 1515.0
Initial Penalty 3031.0
Final Order 2019-05-10
Nr Instances 1
Nr Exposed 4
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.132(d)(1): The employer did not assess the workplace to determine if hazards are present, or are likely to be present, which necessitate the use of personal protective equipment (PPE): (a) Worksite: On or about 4/10/2019, the employer did not ensure that a hazard assessment for personal protective equipment (PPE) was completed and certified, and that the necessary PPE was selected and provided to employees for their protection.
Citation ID 01002
Citaton Type Serious
Standard Cited 19100147 C01
Issuance Date 2019-04-24
Abatement Due Date 2019-06-10
Current Penalty 1895.0
Initial Penalty 3789.0
Final Order 2019-05-10
Nr Instances 1
Nr Exposed 4
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.147(c)(1): The employer did not establish a program consisting of an energy control procedure, employee training and periodic inspections to ensure that before any employee performed any servicing or maintenance on a machine or equipment where the unexpected energizing, startup or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source and rendered inoperative: (a) Worksite: On or about 4/10/2019, the employer had not developed a Lockout/Tag-out program to address the control of machine energy sources during repairs and maintenance.
Citation ID 01003A
Citaton Type Serious
Standard Cited 19100212 A01
Issuance Date 2019-04-24
Abatement Due Date 2019-06-10
Current Penalty 1895.0
Initial Penalty 3789.0
Final Order 2019-05-10
Nr Instances 6
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: (a) Worksite: On or about 4/10/2019, the employer did not ensure that machine guarding was provided on the following machines: Vertical Milling Machines, Lathe, Belt Sander and Buffing Wheel Spindle Ends.
Citation ID 01003B
Citaton Type Serious
Standard Cited 19100212 B
Issuance Date 2019-04-24
Abatement Due Date 2019-06-10
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2019-05-10
Nr Instances 3
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.212(b): Machines designed for fixed locations were not securely anchored to prevent walking or moving: (a) Worksite: On or about 4/10/2019, the employer did not ensure that floor and bench mounted pedestal drill presses were secured from movement.
Citation ID 01003C
Citaton Type Serious
Standard Cited 19100215 B09
Issuance Date 2019-04-24
Abatement Due Date 2019-06-10
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2019-05-10
Nr Instances 1
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.215(b)(9): Guard for abrasive wheel machine where the operator stands in front of the machine was not constructed so that the peripheral protecting member could be adjusted to the constantly decreasing diameter of the wheel: (a) Worksite: On or about 4/10/2019, the employer did not ensure that the bench grinder was equipped with adjustable tongue guards that were adjusted to within one-fourth inch from the abrasive wheel.
Citation ID 01003D
Citaton Type Serious
Standard Cited 19100219 E01 I
Issuance Date 2019-04-24
Abatement Due Date 2019-06-10
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2019-05-10
Nr Instances 1
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.219(e)(1)(i): Horizontal belts which had both runs seven feet or less from the floor level were not guarded with a guard that extended to at least fifteen inches above the belt: (a) Worksite - Tool Room: On or about 4/10/2019, the employer did not ensure that the horizontal belts on the Rockwell drill press were properly guarded, and that the Delta and Langelier drill press horizontal belts were fully guarded.
Citation ID 01004A
Citaton Type Serious
Standard Cited 19100255 B04
Issuance Date 2019-04-24
Abatement Due Date 2019-06-10
Current Penalty 0.0
Initial Penalty 4546.0
Final Order 2019-05-10
Nr Instances 50
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.255(b)(4): All press welding machine operations, where there is a possibility of the operator's fingers being under the point of operation, were not effectively guarded by the use of a device such as an electronic eye safety circuit, two hand controls or protection similar to that prescribed for punch press operation: (a) Worksite: On or about 4/10/2019, the employer did not ensure that the electronic welding units were properly guarded to prevent the operator's fingers and hands from being in the welding point of operation when the units were engaged.
Citation ID 01004B
Citaton Type Serious
Standard Cited 19100255 B06
Issuance Date 2019-04-24
Abatement Due Date 2019-06-10
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2019-05-10
Nr Instances 50
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.255(b)(6): All foot switches were not guarded to prevent accidental operation of the machine: (a) Worksite: On or about 4/10/2019, the employer did not ensure that the foot pedals that actuate the electronic welding units were guarded to prevent the operator, or anyone else, from accidentally engaging the machine while the operators hands or fingers were in the welding point of operation.
17941907 0112300 1993-05-04 977 WATERMAN AVE., EAST PROVIDENCE, RI, 02914
Inspection Type Referral
Scope Partial
Safety/Health Health
Close Conference 1993-05-20
Case Closed 1993-05-24

Related Activity

Type Referral
Activity Nr 902664754
Health Yes
17941832 0112300 1993-03-10 977 WATERMAN AVE., EAST PROVIDENCE, RI, 02914
Inspection Type Prog Other
Scope Complete
Safety/Health Safety
Close Conference 1993-03-10
Case Closed 1993-04-20

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19100037 G01
Issuance Date 1993-03-23
Abatement Due Date 1993-04-10
Current Penalty 190.0
Initial Penalty 375.0
Nr Instances 1
Nr Exposed 28
Gravity 01
Citation ID 01002A
Citaton Type Serious
Standard Cited 19100147 C01
Issuance Date 1993-03-23
Abatement Due Date 1993-04-30
Current Penalty 310.0
Initial Penalty 625.0
Nr Instances 1
Nr Exposed 1
Gravity 03
Citation ID 01002B
Citaton Type Serious
Standard Cited 19100147 C04 I
Issuance Date 1993-03-23
Abatement Due Date 1993-04-30
Nr Instances 1
Nr Exposed 1
Gravity 00
Citation ID 01002C
Citaton Type Serious
Standard Cited 19100147 C07 I
Issuance Date 1993-03-23
Abatement Due Date 1993-07-24
Nr Instances 1
Nr Exposed 1
Gravity 00

Paycheck Protection Program

Loan Number Loan Funded Date SBA Origination Office Code Loan Delivery Method Borrower Street Address
9373248508 2021-03-12 0165 PPP 99 Massasoit Ave, East Providence, RI, 02914-2008
Loan Status Date 2021-10-16
Loan Status Paid in Full
Loan Maturity in Months 60
SBA Guaranty Percentage 100
Loan Approval Amount (at origination) 145710
Loan Approval Amount (current) 145710
Undisbursed Amount 0
Franchise Name -
Lender Location ID 9551
Servicing Lender Name Bank of America, National Association
Servicing Lender Address 100 N Tryon St, Ste 170, CHARLOTTE, NC, 28202-4024
Rural or Urban Indicator U
Hubzone N
LMI Y
Business Age Description Existing or more than 2 years old
Project Address East Providence, PROVIDENCE, RI, 02914-2008
Project Congressional District RI-01
Number of Employees 23
NAICS code 339910
Borrower Race Unanswered
Borrower Ethnicity Unknown/NotStated
Business Type Corporation
Originating Lender ID 9551
Originating Lender Name Bank of America, National Association
Originating Lender Address CHARLOTTE, NC
Gender Unanswered
Veteran Unanswered
Forgiveness Amount 146420.59
Forgiveness Paid Date 2021-09-10

Date of last update: 08 Apr 2025

Sources: Rhode Island Department of State