343759684
|
0112300
|
2019-02-05
|
NEAR 306 SCITUATE AVENUE, CRANSTON, RI, 02921
|
|
Inspection Type |
Planned
|
Scope |
NoInspection
|
Safety/Health |
Safety
|
Close Conference |
2019-02-05
|
Emphasis |
N: CTARGET, P: CTARGET
|
Case Closed |
2019-02-05
|
|
343241295
|
0112300
|
2018-06-20
|
425 MESHANTICUT VALLEY PARKWAY, CRANSTON, RI, 02920
|
|
Inspection Type |
Referral
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2018-07-16
|
Emphasis |
L: FALL
|
Case Closed |
2018-08-20
|
Related Activity
Type |
Referral |
Activity Nr |
1350379 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001A |
Citaton Type |
Serious |
Standard Cited |
19260451 C03 |
Issuance Date |
2018-07-18 |
Current Penalty |
0.0 |
Initial Penalty |
5174.0 |
Final Order |
2018-08-13 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(c)(3): Supported scaffold poles, legs, post, frames, and/or uprights were not plumb and braced to prevent swaying and displacement: (a) On the back, northwest side of the building: On or about 6/20/2018, the pump jack scaffold legs were not upright and plumb to prevent swaying. |
|
Citation ID |
01001B |
Citaton Type |
Serious |
Standard Cited |
19260452 J02 |
Issuance Date |
2018-07-18 |
Abatement Due Date |
2018-07-24 |
Current Penalty |
2587.0 |
Initial Penalty |
0.0 |
Final Order |
2018-08-13 |
Nr Instances |
2 |
Nr Exposed |
2 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.452(j)(2): Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary: (a) On the back northwest side of the building: On or about 6/20/2018, the pump jack scaffold was set up and used, while only securing the scaffold to the top of the structure and not at the bottom. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260451 G04 I |
Issuance Date |
2018-07-18 |
Current Penalty |
5174.0 |
Initial Penalty |
5174.0 |
Final Order |
2018-08-13 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews: (a) On the back, northwest side of the building: On or about 6/19/2018, the end guardrail was not installed, allowing the employee to fall. |
|
Citation ID |
01003 |
Citaton Type |
Other |
Standard Cited |
19260454 A |
Issuance Date |
2018-07-18 |
Abatement Due Date |
2018-08-03 |
Current Penalty |
0.0 |
Initial Penalty |
5174.0 |
Final Order |
2018-08-13 |
Nr Instances |
1 |
Nr Exposed |
2 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards: (a) On the back, northwest side of the building: On or about 6/19/2018, the employer did not adequately train each employee who performed work from a pump jack scaffold in that, the employees worked from the scaffold without an end rail and did not recognize the hazard, exposing the employees to an 18 foot fall hazard. |
|
|
312343718
|
0112300
|
2009-10-21
|
2000 CHAPEL VIEW BOULEVARD, CRANSTON, RI, 02920
|
|
Inspection Type |
Complaint
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2009-10-21
|
Emphasis |
L: FALL, S: POWERED IND VEHICLE, S: FALL FROM HEIGHT, S: COMMERCIAL CONSTR, S: STRUCK-BY, L: FORKLIFT
|
Case Closed |
2010-01-12
|
Related Activity
Type |
Complaint |
Activity Nr |
207311549 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260451 G01 |
Issuance Date |
2009-11-24 |
Abatement Due Date |
2009-12-07 |
Current Penalty |
1400.0 |
Initial Penalty |
2800.0 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
10 |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260501 B14 |
Issuance Date |
2009-11-24 |
Abatement Due Date |
2009-12-07 |
Current Penalty |
1400.0 |
Initial Penalty |
2800.0 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
10 |
|
|
302669148
|
0112300
|
2000-07-12
|
UNIVERSITY HIEGHTS, NORTH MAIN STREET, PROVIDENCE, RI, 02905
|
|
Inspection Type |
Complaint
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2000-07-12
|
Emphasis |
S: CONSTRUCTION
|
Case Closed |
2000-07-18
|
Related Activity
Type |
Complaint |
Activity Nr |
202466124 |
Safety |
Yes |
|
|
100776699
|
0112300
|
1994-09-20
|
ADMIRAL PLAZA, SMITHFIELD RD., NORTH PROVIDENCE, RI, 02904
|
|
Inspection Type |
Unprog Rel
|
Scope |
Complete
|
Safety/Health |
Safety
|
Close Conference |
1994-09-20
|
Emphasis |
L: XEISA
|
Case Closed |
1994-12-07
|
Related Activity
Type |
Complaint |
Activity Nr |
75090027 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260020 B02 |
Issuance Date |
1994-10-28 |
Abatement Due Date |
1994-11-25 |
Current Penalty |
1137.5 |
Initial Penalty |
2275.0 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
05 |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260304 F |
Issuance Date |
1994-10-28 |
Abatement Due Date |
1994-11-03 |
Current Penalty |
687.5 |
Initial Penalty |
1375.0 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
03 |
|
|