Search icon

Sandberg Enterprises, Inc.

Company Details

Name: Sandberg Enterprises, Inc.
Jurisdiction: Rhode Island
Entity type: Domestic Profit Corporation
Status: Activ
Date of Organization in Rhode Island: 11 Mar 1969 (56 years ago)
Date of Dissolution: 17 Sep 2024 (7 months ago)
Date of Status Change: 17 Sep 2024 (7 months ago)
Identification Number: 000008175
ZIP code: 02839
County: Providence County
Principal Address: 806 BRONCOS HIGHWAY, MAPLEVILLE, RI, 02839, USA
Purpose: MACHINE SHOP
Fictitious names: Sandberg Solar (trading name, 2017-06-08 - )
Historical names: M.R.C. CORP.

Industry & Business Activity

NAICS

332710 Machine Shops

This industry comprises establishments known as machine shops primarily engaged in machining metal and plastic parts and parts of other composite materials on a job or order basis. Generally machine shop jobs are low volume using machine tools, such as lathes (including computer numerically controlled); automatic screw machines; and machines for boring, grinding, milling, and additive manufacturing. Learn more at the U.S. Census Bureau

Agent

Name Role Address
LEAH SANDBERG Agent 806 BRONCOS HIGHWAY, MAPLEVILLE, RI, 02839, USA

PRESIDENT

Name Role Address
DONALD SANDBERG PRESIDENT 330 LEDGE RD DAYVILLE, CT 06241 USA

VICE PRESIDENT

Name Role Address
BRUCE SANDBERG VICE PRESIDENT 23 PECK HILL RD JOHNSTON, RI 02919 USA

Events

Type Date Old Value New Value
Name Change 1971-08-13 M.R.C. CORP. Sandberg Enterprises, Inc.

Filings

Number Name File Date
202459517760 Revocation Certificate For Failure to File the Annual Report for the Year 2024-09-17
202457102300 Revocation Notice For Failure to File An Annual Report 2024-06-25
202340799150 Annual Report 2023-09-07
202337982350 Revocation Notice For Failure to File An Annual Report 2023-06-19
202221115640 Annual Report 2022-07-12
202219980630 Revocation Notice For Failure to File An Annual Report 2022-06-27
202189736480 Annual Report 2021-02-03
202039402750 Annual Report 2020-05-07
202039402840 Annual Report 2020-05-07
202039402570 Reinstatement 2020-05-07

USAspending Awards. Contracts

Contract Type Award or IDV Flag PIID Start Date Current End Date Potential End Date
PO AWARD N6660410P0502 2010-02-04 2009-12-21 2009-12-21
Unique Award Key CONT_AWD_N6660410P0502_9700_-NONE-_-NONE-
Awarding Agency Department of Defense
Link View Page

Description

Title FIBERGLASS BARREL
NAICS Code 561990: ALL OTHER SUPPORT SERVICES
Product and Service Codes J099: MAINT-REP OF MISC EQ

Recipient Details

Recipient SANDBERG ENTERPRISES, INC.
UEI LMG9Z415N4P7
Legacy DUNS 062305289
Recipient Address 806 BRONCOS HWY, MAPLEVILLE, 028391214, UNITED STATES

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
347132938 0112300 2023-11-30 806 BRONCOS HIGHWAY, MAPLEVILLE, RI, 02839
Inspection Type FollowUp
Scope Partial
Safety/Health Safety
Close Conference 2023-11-30
Emphasis L: FORKLIFT, N: AMPUTATE
Case Closed 2024-03-04

Related Activity

Type Inspection
Activity Nr 1656952
Safety Yes
346569528 0112300 2023-03-16 806 BRONCOS HIGHWAY, MAPLEVILLE, RI, 02839
Inspection Type FollowUp
Scope Partial
Safety/Health Safety
Close Conference 2023-03-16
Emphasis N: AMPUTATE

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19100147 C01
Issuance Date 2023-05-31
Abatement Due Date 2023-07-18
Current Penalty 4175.0
Initial Penalty 4175.0
Final Order 2023-06-29
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Inspection NR 1713293
FTA Issuance Date 2024-02-28
FTA Current Penalty 5000.0
FTA Final Order Date 2024-03-28
Citation text line 29 CFR 1910.147(c)(1): The employer did not establish a program consisting of an energy control procedure, employee training and periodic inspections to ensure that before any employee performed any servicing or maintenance on a machine or equipment where the unexpected energizing, startup or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source and rendered inoperative. (a) Worksite: On or about 03-16-2023, the employer did not establish a lockout/tagout program consisting of energy control procedures, employee training and periodic inspections.
Citation ID 02001
Citaton Type Repeat
Standard Cited 19100178 L04 III
Issuance Date 2023-05-31
Abatement Due Date 2023-07-18
Current Penalty 1670.0
Initial Penalty 1670.0
Final Order 2023-06-29
Nr Instances 1
Nr Exposed 1
FTA Inspection NR 1713293
FTA Issuance Date 2024-02-28
FTA Current Penalty 3740.0
FTA Final Order Date 2024-03-28
Citation text line 29 CFR 1910.178(l)(4)(iii): An evaluation of each powered industrial truck operator's performance was not being conducted at least once every three years. (a) Worksite: On or about 3/16/2023, the employer did not ensure that each forklift operator received a forklift skills evaluation once every three years. Sandberg Enterprises, Inc. was previously cited for a violation of this occupational health and safety standard, 29 CFR 1910.178(l)(4)(iii), which is contained in OSHA inspection number 1302727, citation number 2, item 2b and was affirmed on a final order on 4/10/2018, with respect to the workplace located at 806 Broncos Highway, Mapleville, RI 02839.
Citation ID 03001
Citaton Type Other
Standard Cited 19040033 A
Issuance Date 2023-05-31
Abatement Due Date 2023-07-18
Current Penalty 835.0
Initial Penalty 835.0
Final Order 2023-06-29
Nr Instances 1
Nr Exposed 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1904.33(a): At this establishment, the employer did not retain (save) the OSHA 300 Log, the privacy case list (if one exists), the annual summary, and the OSHA 301 Incident Report forms for five (5) years following the end of the calendar year that these records covered. (a) Worksite: On or about 3/16/2023, the employer did not retain the OSHA 300 logs, the annual summary, and the OSHA 301's for the past 5 years.
Citation ID 04001A
Citaton Type Other
Standard Cited 19030019 C01
Issuance Date 2023-10-05
Abatement Due Date 2023-11-09
Current Penalty 469.0
Initial Penalty 469.0
Final Order 2023-11-09
Nr Instances 1
Nr Exposed 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1903.19(c)(1):The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: (a) Establishment: As of October 5, 2023, the employer had not certified to OSHA that the abatement had been completed for Citation 1, Item 1, Citation 2, Item 1, and Citation 3, Item 1 from inspection number 1656952, issued on 5/31/2023, with a final order date of 6/29/2023.
Citation ID 04001B
Citaton Type Other
Standard Cited 19030019 D01
Issuance Date 2023-10-05
Abatement Due Date 2023-11-09
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2023-11-09
Nr Instances 1
Nr Exposed 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1903.19(d)(1):The employer did not submit to the Agency documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required. (a) Establishment: As of October 5, 2023, the employer had not provided the required abatement documentation to OSHA for Citation 1, Item 1, Citation 2, Item1, and Citation 3, Item 1 from inspection number 1656952, issued on 5/31/2023, with a final order date of 6/29/2023.
343027272 0112300 2018-03-20 806 BRONCOS HIGHWAY, MAPLEVILLE, RI, 02839
Inspection Type Planned
Scope Complete
Safety/Health Safety
Close Conference 2018-03-20
Emphasis L: FORKLIFT, P: AMPUTATE, N: AMPUTATE
Case Closed 2020-01-09

Violation Items

Citation ID 01001A
Citaton Type Other
Standard Cited 19100179 J01 II B
Issuance Date 2018-03-23
Abatement Due Date 2018-05-22
Current Penalty 0.0
Initial Penalty 2513.0
Final Order 2018-04-10
Nr Instances 5
Nr Exposed 4
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.179(j)(1)(ii)(b): Complete inspections of the crane shall be performed at intervals of 1 to 12 months for detecting cracked or deformed members, worn or distorted parts such as pins, bearings and shafts as well as excessive wear on brakes: (a) Worksite: On or about 3/20/2018, the employer did not ensure that a periodic inspection of all overhead cranes was conducted.
Citation ID 01001B
Citaton Type Other
Standard Cited 19100184 C01
Issuance Date 2018-03-23
Abatement Due Date 2018-05-22
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2018-04-10
Nr Instances 6
Nr Exposed 4
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.184(c)(1): Slings that were damaged or defective were used: (a) Worksite: On or about 3/20/2018, the employer did not take damaged (worn and torn) web slings out of service.
Citation ID 01001C
Citaton Type Other
Standard Cited 19100184 C14
Issuance Date 2018-03-23
Abatement Due Date 2018-05-22
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2018-04-10
Nr Instances 9
Nr Exposed 4
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.184(c)(14): Slings were used without having affixed and legible identification markings: (a) Worksite: On or about 3/20/2018, the employer did not take web slings with missing or illegible data tags out of service.
Citation ID 01002A
Citaton Type Serious
Standard Cited 19100212 A01
Issuance Date 2018-03-23
Abatement Due Date 2018-05-22
Current Penalty 2200.0
Initial Penalty 3141.0
Final Order 2018-04-10
Nr Instances 3
Nr Exposed 4
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: (a) Worksite: (1) On or about 3/20/2018, the employer did not ensure that lathe chuck guards were installed for use on lathes such as, but not limited to: Warner & Swasey No. 5, Reed-Prentice and the Clausing Lathe. (2) On or about 3/20/2018, the employer did not ensure that the drive wheels on the two Marvel Band Saws in the welding area were guarded below the cutting table.
Citation ID 01002B
Citaton Type Serious
Standard Cited 19100212 B
Issuance Date 2018-03-23
Abatement Due Date 2018-05-22
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2018-04-10
Nr Instances 2
Nr Exposed 4
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.212(b): Machines designed for fixed locations were not securely anchored to prevent walking or moving: (a) Worksite: Machine Shop and Welding Department: On or about 3/20/2018, the employer did not ensure that the Dayton pedestal grinder and the Buffalo FDM-12 drill press were secured from walking and movement.
Citation ID 01002C
Citaton Type Serious
Standard Cited 19100215 A04
Issuance Date 2018-03-23
Abatement Due Date 2018-05-22
Current Penalty 0.0
Initial Penalty 2513.0
Final Order 2018-04-10
Nr Instances 1
Nr Exposed 4
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.215(a)(4): Grinding machinery was not used with work rest(s) to support offhand grinding work: (a) Workplace - Welding Department: On or about 3/20/2018, the employer did not ensure that the Ryobi six inch grinder was used with its tool work rests, leaving a gap of approximately one-half inch to the grinding wheel.
Citation ID 01002D
Citaton Type Serious
Standard Cited 19100215 B09
Issuance Date 2018-03-23
Abatement Due Date 2018-05-22
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2018-04-10
Nr Instances 2
Nr Exposed 4
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.215(b)(9): The distance between the abrasive wheel periphery(s) and the adjustable tongue or the end of the safety guard peripheral member at the top exceeded one-fourth inch: (a) Worksite: Machine Shop and the Welding Department: On or about 3/20/2018, the employer did not ensure that the tongue guards were in place on the Ryobi six inch grinder and the General Electric grinder, leaving a gap of approximately one-half inch on the Ryobi and more than two inches on the General Electric model.
Citation ID 02001
Citaton Type Other
Standard Cited 19100147 C04 II
Issuance Date 2018-03-23
Abatement Due Date 2018-05-22
Current Penalty 0.0
Initial Penalty 353.0
Final Order 2018-04-10
Nr Instances 1
Nr Exposed 4
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): (a) Worksite: On or about 3/20/2018, the employer had not developed written machine specific Lockout/Tag-out procedures for the control of hazardous energy.
Citation ID 02002A
Citaton Type Other
Standard Cited 19100178 A06
Issuance Date 2018-03-23
Abatement Due Date 2018-05-22
Current Penalty 0.0
Initial Penalty 353.0
Final Order 2018-04-10
Nr Instances 1
Nr Exposed 4
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.178(a)(6): The employer did not ensure that all nameplates and markings were in place: (a) Worksite: On or about 3/20/2018, the employer did not ensure that the Komatsu FG25 forklift had a data plate.
Citation ID 02002B
Citaton Type Other
Standard Cited 19100178 L04 III
Issuance Date 2018-03-23
Abatement Due Date 2018-05-22
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2018-04-10
Nr Instances 1
Nr Exposed 4
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.178(l)(4)(iii): An evaluation of each powered industrial truck operator's performance was not being conducted at least once every three years: (a) Worksite: On or about 3/20/2018, the employer did not ensure that each forklift operator received a forklift skills evaluation once every three years.
300091808 0112300 1997-01-15 225 HOPKINS HILL ROAD, COVENTRY, RI, 02816
Inspection Type Planned
Scope Complete
Safety/Health Health
Close Conference 1997-01-15
Case Closed 2011-01-05
122516271 0112300 1994-11-10 225 HOPKINS HILL ROAD, COVENTRY, RI, 02816
Inspection Type Planned
Scope Complete
Safety/Health Safety
Close Conference 1994-11-10
Case Closed 1994-12-15

Violation Items

Citation ID 01001
Citaton Type Other
Standard Cited 19100038 A01
Issuance Date 1994-11-18
Abatement Due Date 1995-05-10
Nr Instances 1
Nr Exposed 25
Gravity 00
Citation ID 01002
Citaton Type Other
Standard Cited 19100038 B01
Issuance Date 1994-11-18
Abatement Due Date 1995-05-10
Nr Instances 1
Nr Exposed 25
Gravity 00
Citation ID 01003
Citaton Type Other
Standard Cited 19100304 F05 V
Issuance Date 1994-11-18
Abatement Due Date 1994-11-23
Nr Instances 1
Nr Exposed 20
Gravity 00
Citation ID 01004
Citaton Type Other
Standard Cited 19101200 E01
Issuance Date 1994-11-18
Abatement Due Date 1995-05-10
Nr Instances 1
Nr Exposed 25
Gravity 00

Paycheck Protection Program

Loan Number Loan Funded Date SBA Origination Office Code Loan Delivery Method Borrower Street Address
1496038508 2021-02-19 0165 PPS 806 Broncos Hwy, Mapleville, RI, 02839-1214
Loan Status Date 2022-02-15
Loan Status Paid in Full
Loan Maturity in Months 60
SBA Guaranty Percentage 100
Loan Approval Amount (at origination) 130000
Loan Approval Amount (current) 130000
Undisbursed Amount 0
Franchise Name -
Lender Location ID 33371
Servicing Lender Name Bristol County Savings Bank
Servicing Lender Address 29 Broadway, TAUNTON, MA, 02780-3269
Rural or Urban Indicator U
Hubzone N
LMI N
Business Age Description Existing or more than 2 years old
Project Address Mapleville, PROVIDENCE, RI, 02839-1214
Project Congressional District RI-02
Number of Employees 12
NAICS code 332710
Borrower Race Unanswered
Borrower Ethnicity Unknown/NotStated
Business Type Corporation
Originating Lender ID 33371
Originating Lender Name Bristol County Savings Bank
Originating Lender Address TAUNTON, MA
Gender Unanswered
Veteran Unanswered
Forgiveness Amount 131123.06
Forgiveness Paid Date 2021-12-29
3994667406 2020-05-08 0165 PPP 806 BRONCOS HWY, MAPLEVILLE, RI, 02839-1214
Loan Status Date 2022-02-09
Loan Status Paid in Full
Loan Maturity in Months 24
SBA Guaranty Percentage 100
Loan Approval Amount (at origination) 130000
Loan Approval Amount (current) 130000
Undisbursed Amount 0
Franchise Name -
Lender Location ID 33371
Servicing Lender Name Bristol County Savings Bank
Servicing Lender Address 29 Broadway, TAUNTON, MA, 02780-3269
Rural or Urban Indicator U
Hubzone N
LMI N
Business Age Description Existing or more than 2 years old
Project Address MAPLEVILLE, PROVIDENCE, RI, 02839-1214
Project Congressional District RI-02
Number of Employees 15
NAICS code 332710
Borrower Race Unanswered
Borrower Ethnicity Unknown/NotStated
Business Type Corporation
Originating Lender ID 243908
Originating Lender Name Freedom National Bank, A Division of
Originating Lender Address GREENVILLE, RI
Gender Unanswered
Veteran Unanswered
Forgiveness Amount 131610.56
Forgiveness Paid Date 2021-07-29

Date of last update: 06 Apr 2025

Sources: Rhode Island Department of State